Plumbing Work We’ve Done in Calgary
Take a look at recent plumbing jobs in Calgary, from leak repair and leak detection to drain clearing, water heater replacements and full fixture installs. Every job is done by a fully licensed Red Seal Plumber & Alberta Gasfitter B.
Ceiling Leak Repair – Calcified Wet Vent Replaced
Wimbush Waterworks responded to a living room leak, moving furniture with the homeowner to keep the space clean. The ensuite sink above was confirmed as the source and an access opening was cut in the ceiling. A heavily calcified 2” wet vent was located.
After reviewing options, a return visit was booked. The following week the old leaking section was removed and replaced with new pipe rebuilt to the sink P-trap. The sink was filled and drained with no leaks and full function restored.
Heating Unit Tune-Up – Force Flow & Infrared
Wimbush Waterworks completed a preventative maintenance tune-up on the force-flow heater: cleaning, gas pressure checks, cycle testing, and inspection of the board, flame sensor, and igniter. Cleaned with compressed air and heat exchanger-safe solution; flame sensor cleaned and refined with graded cloth. Same service finished on the garage infrared heater—all done that morning.
Whole-Home Grease Blockage Cleared
Wimbush Waterworks arrived to a suspected drain issue that diagnosis quickly showed was affecting the entire home. The toilet was removed and a large auger was run roughly 40 feet to break through the blockage. Camera inspection confirmed heavy grease buildup.
A specialized auger head was then used to scrape the line clean and restore full-diameter flow, verified with a second camera pass. The toilet was remounted, every fixture was flushed to clear the building drain, and the home was returned to 100% function.
20-Storey Domestic Hot Water Section Replacement
Wimbush Waterworks coordinated a full-building domestic hot water shutdown with the building manager of a 20-storey tower to replace a heavily patched section of 2” copper.
After isolating and draining the line, the old section was removed and a new run of 2” copper was fabricated, soldered (with the fire alarm panel bypassed), and tied back into the 1” recirculating line. The system was restored, confirmed leak-free, and the recirculating line was bled of air—completed ahead of schedule, to the satisfaction of the building manager and occupants.